

Peel Centre
Colindale, London
Residential
Duration
2015 - Ongoing
Type
Residential
Services
Working Drawings
We produced the working drawings for two large residential buildings for Redrow Homes in Colindale. The development will create a mix of 100 and 120 private and affordable homes. The Peel Centre, previously a police training college is expected to be completed in 2021.